  • Globe Lane Primary School

    Installation: Full Mechanical and Electrical Installation Main Contractor: Carillion. Tameside BSF Approx Building size: 2045 m2 A two storey primary school new build commissioned as part of the Tameside BSF programme, consisting of standard classroom / teaching / staff  areas with hall
    Continue reading »

    No Comments
  • Dale Grove Primary Referral Unit

    Installation:  Full Mechanical and Electrical Installation Main Contractor: Carillion. Tameside BSF Approx Building size: 2015 m2 A new build two storey primary referral unit designed for teaching children with challenging behaviour. Whilst the building has classroom / teaching / staff  areas the
    Continue reading »

    No Comments
  • Blackburn Lift Project

    Installation: Full Mechanical Installation Main Contractor: Eric Wright Construction Approx Building size: 8083 m2 A new five storey Lift project procured on a traditional pre designed basis, providing a wide range of health services, situated in the heart of Blackburn Town Centre.
    Continue reading »

    No Comments
  • Great Sankey 6th Form Block

    Installation: Full Mechanical and Electrical Installation Main Contractor: McGoff and Byrne Approx Building size: 2560 m2 This project adds a new client to the Ameon group, the three storey 6th form block is a new addition to the school campus and has
    Continue reading »

    No Comments
  • Hyde Technology School

    Installation: Full Mechanical and Electrical Installation Main Contractor: Carillion. Tameside BSF Approx Building size: 9850 m2 This flagship high school constructed over three levels provides a much needed modern teaching facility to the Tameside area. The three storey building procured on a