- Ameon Racing (3)
- Contracts Awarded (8)
- News (2)
- Newsletter (1)
- Technical (1)
- Press Release (7)
Latest News
Great Sankey 6th Form Block
- Installation: Full Mechanical and Electrical Installation
- Main Contractor: McGoff and Byrne
- Approx Building size: 2560 m2
This project adds a new client to the Ameon group, the three storey 6th form block is a new addition to the school campus and has been procured on a traditional basis with an element of design input from ourselves. The building has a range of M&E services and embraces new technology with both solar and Air source heat pumps incorporated within the scheme.